Posts

Showing posts with the label materials

What Role Do Contractors Play in Green Construction?

Owners and architects are typically the drivers of sustainable design, whether their goals are to achieve a certification like LEED or simply to ensure as little negative environmental impact as possible during the building's lifecycle. Contractors, too, are in a position to influence how green a project can be, both during construction and after completion. After all, it takes buy-in and ownership from all stakeholders to achieve a project's green ambitions. With invested clients and the products and systems to do the job, contractors today can make more of an impact on sustainability than ever before. The first step toward that objective is for the owner and design team to fully communicate the project's sustainability goals to the contractor as early as possible in the bid phase, said Kristin Schuster, a project architect with  SWBR , in Rochester, NY. From there, the contractor can help shepherd along — and even improve upon — those goals as it carries ...

High Demand and Limited Supply Drive Construction Labor Costs Up

The law of supply and demand is one of the basic drivers of construction economics. It is integral to cost and profit for any construction business from materials suppliers to on site labor and contractors. Labor supply is closely tied to the demand side of the curve and the supply of skilled craftsman is fast becoming an issue that will drive the cost of labor up until a solution can be found. Today we are witnessing the long-term results from those programs that encouraged more students to go to college and discouraged students from taking those courses that lead to the building trades. A recent article in one of the Houston area community newspapers pointed out just how difficult the labor supply issue is becoming in Katy located on the west side of Houston and one of the fastest growing suburbs in the region. As the article titled, " Katy's cost of construction " reports, "Fewer technical students, undocumented labor play role in ongoing labor shortage. ...

713.15 and Repo of Construction Materials

Image
713.15, Fla. Stat. provides: " If for any reason the completion of an improvement is abandoned or though the improvement is completed, materials delivered are not used therefor, a person who has delivered materials for the improvement which have not been incorporated therein and for which he or she has not received payment may peaceably repossess and remove such materials or replevy the same and thereupon he or she shall have no lien on the real property or improvements and no right against any persons for the price thereof, but shall have the same rights in regard to the materials as if he or she had never parted with their possession."  Trenton H. Cotney Board Certified in Construction Law Trent Cotney, P.A. 1207 N Franklin St, Ste 222 Tampa, FL 33602 (813) 579-3278 www.trentcotney.com